|
No. |
File Name |
Description |
Size |
Updated |
|
1 |
2000.dgn
2000.pdf |
General Traffic Control Plan Notes
TCP Notes in PDF Format |
84KB
29KB |
12/23/09
12/23/09 |
|
2 |
2001 |
Standard Details for Traffic Control Plans |
166KB |
06/23/05 |
|
3 |
2001a |
Standard Details for Traffic Control Plans |
183KB |
01/10/03 |
|
4 |
2002 |
Details for Traffic Control for Two Lane Highways |
164KB |
03/30/07 |
|
5 |
2003 |
Details for Traffic Control for 5- Lane Highways |
163KB |
03/30/07 |
|
6 |
2003a |
Details for Traffic Control for 5- Lane Highways |
170KB |
03/30/07 |
|
7 |
2004 |
Details for Traffic Control for 5- Lane Highways |
153KB |
01/01/03 |
|
8 |
2005 |
Typical Placement of Advance Warning Signs for Multilane Undivided Highways |
108KB |
03/30/07 |
|
9 |
2006 |
Details for Multilane Undivided Highway Lane Closures |
130KB |
01/01/03 |
|
10 |
2007 |
Typical Placement of Advance Warning Signs for Multilane Divided Highways |
110KB |
03/30/07 |
|
11
|
2008
2008a |
Details for Multilane Divided Highway Lane Closures
Details for Multilane Divided Highway Lane Closures |
132KB
101KB |
01/01/03
03/30/07 |
|
12 |
2009 |
Typical Placement of Advance Warning Signs for Freeways and Interstate Highways |
110KB |
03/30/07 |
|
13 |
2010 |
Details for Freeways and Interstate Highway Lane Closures |
132KB |
11/03/03 |
|
14 |
2011 |
Details of Traffic Control for Work in the Vicinity of Entrance Ramps |
155KB |
10/28/04 |
|
15 |
2012 |
Details of Traffic Control for Work in the Vicinity of Entrance Ramps (with vehicle impact attenuator) |
161KB |
10/28/04 |
|
16 |
2013 |
Details of Traffic Control for Work in the Vicinity of Entrance Ramp Shoulder Work |
117KB |
10/28/04 |
|
17 |
2014 |
Details for Traffic Control for Work in the Vicinity of Exit Ramps |
114KB |
01/01/03 |
|
18 |
2015 |
Details for Traffic Control for Work in the Vicinity of Exit Ramps (with vehicle with impact attenuator) |
116KB |
01/01/03 |
|
19 |
2016 |
Details of Traffic Control for Exit Ramp Shoulder Work |
142KB |
10/28/04 |
|
20 |
2017 |
Details of Traffic Control for Resurfacing Two Lane Highways |
144KB |
03/30/07 |
|
21 |
2018 |
Details of Traffic Control for Resurfacing Two Lane Highways (Pilot Car Method) |
142KB |
03/30/07 |
|
22 |
2019 |
Details of Freeway/Interstate shoulder closures |
142KB |
01/01/03 |
|
22 |
2020 |
Details for Temporary Road Closure for Multilane Divided or Interstate Highways |
97KB |
01/01/03 |
|
23 |
2021 |
Details for Traffic Control for 3-Lane Highway Closures |
151KB |
01/01/03 |
|
24 |
2022 |
Details for Freeway and Interstate Highway Double Lane Closures |
176KB |
11/03/03 |
|
25 |
2022a |
Details for Freeway and Interstate Highway Double Lane Closures |
176KB |
11/03/03 |