ALDOT Bridge Bureau
William (Tim) Colquett, P.E.
Bridge Engineer
1409 Coliseum Boulevard
Montgomery, Alabama 36130-3050

Bridge Bureau Phone List

ALDOT Department and Bridge Documents

Bridge Quality Control and Quality Assurance Plans


Bridge Bureau CADD Files

The ALDOT officially uses MicroStation from Bentley Systems, Inc. as the primary CADD program.
These files are in a compressed format and will require PKUNZIP or WINZIP to decompress.


Bridge ATRIP Program