Enter search words here:

Maintenance Bureau

Traffic Product Testing and Evaluation

Link to Materials & Test, APL Page

 Submittal/Testing Procedure         Revision Date Product Listing Last
Updated
Description
IV-1 Procedures 02/15/2005    List IV-1    04/15/2015 Traffic Controllers And/Or Cabinets
IV-2 Procedures 02/15/2005    List IV-2    04/06/2015 Individual Traffic Signal Items
IV-3 Procedures 07/02/2012    List IV-3    03/02/2015 Work Zone Traffic Control Devices
IV-4 Procedures 10/13/1995    List IV-4    04/21/2015 Miscellaneous Traffic Control Devices
IV-5 Procedures 10/13/1995    List IV-5    02/02/2015 Breakaway Connectors for Lightweight or Bendaway and Standard or Rigid Sign Supports

Testing Fee Schedule - effective 2 April 2012 for the above Lists!

Maintenance Bureau Process Flow for Evaluation and Testing (rev 01/25/2006) 

(NOTE:  Acrobat Reader is required in order to view the documents listed above.)