UTILITIES

Robert Lee, P.E.
Assistant Bureau Chief, Utilities Engineer
1409 Coliseum Boulevard
Montgomery, Alabama 36110
(334)242-6155

MISSION:

Responsible for permitting utilities on Right-of-Way (ROW) and relocating utilities in conflict with highway construction

The overriding goal for the Utilities Section is to allow the user to locate and understand the regulations and procedures which are most pertinent to the portion of the utility process. The highway-utilities process embraces a large and exceedingly complex series of issues. Utilites meet several primary and specific objectives:

  1. To provide standard arrangements for permitting the installation of utilities on existing rights-of-way and relocating utilities for highway construction, so that the work can be performed with the least delay and with the minimum interference with highway contractors or other utilities; to minimize service disruptions and damage to utility plant; to minimize hazardous conditions; to assure that standards, specifications, and environmental considerations are met; to reasonably preclude liabilities and claims of all types; and when necessary, to coordinate utility work with highway contractors' operations

  2. To assure that utility work is done properly, is of high quality, and is done in a timely manner; and that utility owners are reimbursed (where appropriate) properly and promptly
  3. To outline procedures and conditions which must be met for federal reimbursement, when utility work is a portion of a federal-aid project
UTILITIES CONTACTS
Robert G. Lee Assistant Bureau Chief, Utilities Engineer (334)242-6155 leer@dot.state.al.us
Adam Holder Assistant Utilities Engineer (334)242-6581 holdera@dot.state.al.us
JoAnn Turner Administrative Assistant (334)242-6177 turnerjoa@dot.state.al.us
Anna Harris Transportation Technologist, Senior (334)242-6237 harrisa@dot.state.al.us
Alan Davis Transportation Technologist, Senior (334)242-6704 davisa@dot.state.al.us
Yvonne Hawkins Engineering Assistant (334)242-6790 hawkinsy@dot.state.al.us
Nathan Boswell Civil Engineering Graduate (334)242-6647 boswelln@dot.state.al.us

Utilities Forms & Manual

Utilities Forms

For the MANUAL click the following... Utilities Manual

SAHD No1 Non-Reimbursable Agreement For relocation of utility facilities on public ROW .pdf 03-03-2015
SAHD No2 Reimbursable Agreement For relocation of utility facilities on private or public ROW
NOTE: Exhibit N need to be attached hereto and made a part hereof
.pdf 09-05-2017
EXHIBIT N EXHIBIT N NOTE: SAHD 2 need to be attached hereto and made a part hereof .pdf 10-23-2012
EXHIBIT S EXHIBIT S NOTE: Certificate of Compliance with ACT 2016-312 .pdf 01-26-2018
SAHD No3 Reimbursable Agreement For relocation of utility facilities on private or public ROW; Work to be done by State Contractor .pdf 10-06-2017
SAHD No4 Non-Reimbursable Agreement For relocation of utility facilities on public ROW; Work to be done by State Contractor .pdf 03-05-2015
SAHD No6 Reimbursable Agreement To Supplement an SAHD No. 2 Agreement in the case of a major cost overrun. .pdf 09-05-2017
SAHD No12 Agreement to Terminate a Reimbursable To cancel SAHD No2 .pdf 03-03-2015
Buy America Certificate Buy America Certificate ALDOT Buy America Certificate of Compliance .pdf 8-30-2013
Utilities Manual ALDOT Utilities Manual Outlines requirements and procedures necessary to accomplish utility relocation, maintenance, or new utility construction work. .pdf