ALDOT

In Person and Online Public Involvement: Bridge Replacement over Bogue Creek

In Person and Online Public Involvement: Bridge Replacement over Bogue Creek

Project Overview

Location: Sulligent (Lamar County)

The proposed project is located on AL-118 (US-278) in the City of Sulligent, Lamar County, Alabama. The project proposes to replace the existing bridges (BINs 001818 and 001819) over Bogue Creek with wider bridge culverts. Construction of the proposed project will be done in phases and the road will remain open during construction. Additional right-of-way will be required.

The purpose of this public involvement meeting is to inform the public of the design features for the project. The Alabama Department of Transportation (ALDOT) is interested in obtaining input from the people who use this route.

Thank you for visiting our website.
ALDOT is conducting online public involvement for the proposed project. All comments regarding this project must be submitted on or before Wednesday, December 6, 2023.

IN PERSON MEETING INFO

Monday, November 6, 2023
5:00pm - 7:00pm
Sulligent High School
661 Elm Street
Sulligent, AL 35586

Anyone with a disability requiring special assistance, should contact the Region office at the above address or call (205) 507-4487 at least two days in advance of the meeting. The meeting facilities are wheelchair accessible.

Online: Comment Form
Email: us278-bridge@dot.state.al.us
Phone: (205) 462-2388 to leave comments (Limit 3 minutes)
Postal Mail (See Comment Form in Downloads)

Mail comments to:
Alabama Department of Transportation
West Central Region Office
ATTN: Environmental Coordinator
204 Marina Dr, Suite 100
Tuscaloosa, AL 35406

Questions can be directed to:
Ms. Adriana Dunn
West Central Region Pre-Construction Engineer
Alabama Department of Transportation
(205) 562-3106

Posted on: 10/16/2023