Construction Forms

`
ENGLISH VERSION METRIC VERSION
Form 3: Project Voucher Payable
C-8: Contactless Weight Ticket Log C-8: Metric
C-10: Progress Schedule of Operations C-10: Metric
C-14: Pile and Driving Equipment Data Form C-14: Metric
C-15A: Test Pile Record C-15A: Metric
C-15A-2: Continuation of Test Pile Record C-15A-2: Metric
C-15B: Pile Loading Record - Quick Load Test C-15B: Metric
C-15B-3: Pile Loading Record - Quick Load Test (Graph) C-15B-3: Metric
C-15C: Proposed Pile Lengths C-15C: Metric
C-16C: Driving Record of Concrete Piling
C-16S: Driving Record of Steel Piling
C-17: Material Pit Release
C-18: Construction Inspection Report - Federal Aid County Projects
C-19: Time Extension Request (For Working Day or Calendar Day Projects)
C-19A: Time Extension Request (For Calendar Date Projects)
C-20: Progress Report
C-21: Partial Payment of Stored Materials
C-23: Affidavit for Payment of Debts Incurred on Construction Projects
C-24: Weekly Report of Railway Inspection and/or Flagging
C-25: Daily Inspection of Traffic Control Devices (Click Here for 12 page Version)
C-25A: Crash Report
C-28: HMA Production Cost Adjustment Worksheet C-28: Metric
C-32: Drilled Shaft Modification Request
C-34: Stormwater Inspection Report and BMP Certification
C-35: Drilled Shaft Pouring Record C-35: Metric
C-35-2: Graph for Drilled Shaft Pouring Record C-35-2: Metric
C-36: Test Drilled Shaft Loading Record
C-37: Stormwater Noncompliance Notification Report
C-38: Stormwater Turbidity Sampling Report
C-40: Material Submittal
C-42: Stormwater Meeting Checklist
BC-101: Inspector's Daily Reports
DBE: Commercially Useful Function (CUF) Evaluation Form
DBE-10: Aldot Form Plan
DBE-11: Certification of Actual Payments to DBE Firms
EEO-110: Monthly Employee Interview
OE-110: DBE Utilization Plan
QC/QA-1: Summary of Initial Test Results
QC/QA-2: Summary of Referee Test Results
*QC/QA-3: Asphalt Pay Factor Adjustment Worksheet
*QC/QA-3: Asphalt Pay Factor Adjustment Worksheet
SJ-120: Contract Time Summary
SJ-120: Contract Time Summary
Bituminous Material Price Adjustment Worksheet BMPAW - Metric
Bituminous Material Price Adjustment Items Table

*Form QC/QA-3 - Revised 3/2010. Effective with the April 2010 Letting. This form may be used on projects let prior to April 2010 at your discretion. Payment for adjusted tonnage is by a dollar amount.