In-Person and Online Public Involvement: Main Avenue Improvements

Online Public Involvement: Main Avenue Improvements

Project Overview

Location: Northport (Tuscaloosa County)

The proposed project involves resurfacing, curb and gutter, traffic control markings, 6-ft sidewalk, ADA curb ramps, brick pavers, lighting, drainage improvements, and additional streetscape improvements on Main Avenue from 5th Street to AL-6 (US-82). A roundabout will be installed at 10th Street to alleviate congestion at this location. A small park area will be added within the right-of-way between 10th Street and Park Street to provide a social gathering space with outdoor seating. The project aims to improve the city’s infrastructure, while providing pedestrian connectivity to the downtown district.

The purpose of this public involvement meeting is to inform the public of the design features for the project. ALDOT is interested in obtaining input from the people who use this route.
Thank you for visiting our website.
ALDOT is conducting online public involvement for the proposed project. All comments regarding this project must be submitted on or before Wednesday December 14, 2022.

IN PERSON MEETING INFO


Tuesday, November 29, 2022
5:00 PM to 7:00 PM
Northport City Hall
3500 McFarland Blvd
Northport, AL 35476

Project Presentation Video - Coming Soon

*Large maps may take longer to download

Online: Comment Form
Email: info@yellowhammereng.com
Phone: (205) 507-4467 to leave comments (Limit 3 minutes)
Postal Mail (See Comment Form in Downloads)

Mail comments to:
Yellowhammer Engineering
Attn: Russ Ware, P.E.
2205 4th St - Suite 22
Tuscaloosa, AL 35401

Questions can be directed to:
Russell D. Ware Jr.
President
Yellowhammer Engineering, LLC
(205) 771-6200
info@yellowhammereng.com